Combined capacity
280
According to 2. A temporary adduction
about 100,000 gallons
in the band
ary
A discussion has been laid, whereby
water will be delivered, as it is procured to all the tanks simultaneously
the water will be drawn into
and from these brackets through large taps, from which there will be
lack
To alleviate
the services of the tug Praya
built for the
Reclamation Work are available
and will be used for towing the Lighters to
It is anticipated that the scheme will be
in force from March. Loading
and that barges will work round the clock daily, providing
at least 250,000 gallons per day or
gallons per head for the population
to be served.
In addition to the above
arrangements have been made to obtain a
supply for the eastern district from a reservoir belonging to Messrs Butterfield and Swire, which is situated on
the hills between the district and Quarry Bay. The quantity available from this source is 15,000,000 gallons.
Mess
conrbined capacity
280
ccounting to 2. A tempor adfinches
about 100,000 gallons
in of band
ary
discuter has been laid, wheel
will deliver the quater, as it is peccused to all the lacks suc yttaniously
the water will be drawn into
and from these brackets through large taps, fear which there will be
lack
To allean
the services of the tug Praya
built for the
which
Reclamation
Work of are availabl
and will be cased for lowing the Lighters to aci
Es that the scheme will be
fro. It is anticipar March Loghing
ľú
over be the 5th Mare! and that back; lighter will wake round hip daily, dices providing
at least 250,000 gallous fur day or
allons per head for the proprctation
الحرة
کچھ
to be served.
du addition to the above
arrangements have been made to obtain a
for
eastern dish cupply the the
bily from a reservoir belonging to M14520 Butterfield and Sevire, which is sitecated on
the hill's befween the bily and Quarry Bay. The quantity available pour this source to 15,000,000 fallous.
f
Mess
No comments yet.